Capacity (BPD) |
Power (Kw/d) |
Fabrication Period (month) |
Area (Acre) |
Skid Number |
Weight (Ton) |
|
MR10 |
1000 |
150 |
5 |
1 |
5 |
120 |
MR30 |
3000 |
200 |
5 |
2 |
7 |
160 |
MR50 |
5000 |
275 |
6 |
2 |
8 |
200 |
MR100 |
10000 |
350 |
6 |
3 |
11 |
375 |
EPC Scope of Work |
||||
No. |
Item |
|
By PCC |
By End-user |
1 |
Feasibility Study |
Engineering |
|
√ |
2 |
Basic Design |
√ |
|
|
3 |
Detail Design |
√ |
|
|
4 |
Budgeted Deliverables |
√ |
|
|
5 |
local government approval and supervision |
|
√ |
|
6 |
Purchase Requisitions |
√ |
|
|
7 |
Parsed MTO |
Procurement |
√ |
|
8 |
Purchase Order |
√ |
|
|
9 |
Transportation & Logistics |
√ |
|
|
10 |
Release to Construction |
√ |
|
|
11 |
Contracts |
√ |
|
|
12 |
General Const.Plan |
Construction |
√ |
|
13 |
Civil work |
|
√ |
|
14 |
Piping |
√ |
|
|
15 |
System Turn-over |
√ |
|
|
16 |
Start-up & Commissioning |
√ |
|
|
17 |
Performance Run |
√ |
|
|
18 |
Turn-Over to end-user |
√ |
|
|
|
||||
OSBL & ISBL Scope of Work |
|
|
|
|
No. |
Item |
|
By PCC |
By End-user |
1 |
10000 BPD CDU+VDU |
Inside Battery Limits |
√ |
|
2 |
Tank Farm |
Outside Battery Limits |
|
√ |
3 |
Water Supply and Drainage System |
|
√ |
|
4 |
Power Supply and Telecommunication System |
√ |
|
|
5 |
System Pipelines |
√ |
|
|
6 |
Central Control Room |
|
√ |
|
7 |
Wharf and Berth |
|
√ |
|
8 |
Vehicle Load-Unload Facility |
√ |
|
|
9 |
Flare System |
√ |
|
API 중력 36.25 및 메르 캅탄 황 1.3ppm과 같은 나이지리아 원유 중 하나를 선택하십시오.
24 시간 내에 연락 드리겠습니다.